← Back to selectionPrefabricated light steel structures

Build faster. Build stronger. With numbers that add up.

Tigaset delivers complete light steel structural systems for developers, general contractors and private investors. Factory prefabrication and on-site assembly can significantly shorten the construction programme compared with conventional methods — potentially by up to 60% in suitable projects. Actual savings depend on project scope, design, logistics and the comparison method.

Who we work for

Four client profiles, four different priorities — one technology that adapts to each of them.

01

Developer & PRS/BTR fund

Repeatable schedule, binding pricing, higher IRR through a shorter capital cycle. Scalable across estates and residential portfolios.

02

Private investor

A home ready to move in on a predictable date. Lower utility bills, a 30-year structural warranty subject to the applicable warranty conditions, no financial surprises mid-build.

03

General contractor

Prefabricated components to millimeter precision, EN 1090 technical documentation, engineering support at assembly. Shorter site window, fewer claims.

04

Implementation partner & distributor

Cooperation with companies in international markets: technical support, implementation planning and coordinated deliveries.

01 — Four reasons developers choose Tigaset

Each one translates directly into schedule, budget and the value of the finished asset.

01

Assembled in days, not weeks

Elements prefabricated to millimeter precision. Shorter schedule, fewer people on site, reduced exposure to weather disruption on site. Actual time savings depend on project design, prefabrication scope and logistics.

02

Durability measured in decades

Galvanized steel provides corrosion protection and does not provide a food source for pests. The required fire resistance is achieved through the engineered build-up of the complete wall, floor or roof system.

03

Hard project economics

Shorter build = lower cost of capital. Fewer crews on site = lower overhead. Faster handover = earlier revenue from sales or rent.

04

Supporting Environmental and ESG Objectives

Structural steel is recyclable. Factory-controlled production and pre-cut components can significantly reduce on-site material waste compared with conventional on-site cutting and processing; actual results depend on the project.

02 — Investor economics

Shorter build cycle. Faster return on capital.

Factory prefabrication can shorten the programme and bring project revenue forward. Depending on project scope, design, logistics and the conventional method used for comparison, the construction cycle can potentially be up to 60% shorter. The lower structural weight can also reduce foundation requirements and potentially lower foundation costs — by up to 40% in suitable conditions — subject to structural design, ground conditions and geotechnical assessment.

up to 60%

potentially shorter build cycle

30 years

structural warranty

up to 40%

potentially lower foundation cost

100%

factory-controlled production

Indicative values. Actual results depend on project design, scope, comparison baseline, local conditions, logistics and execution methodology. The warranty applies subject to the applicable warranty conditions.

A budget that holds

Factory prefabrication reduces exposure to weather, on-site processing and material-loss risks. Pricing and programme are established for the specific project, documentation and delivery model.

More sellable area from the same plot

Thinner wall assemblies can increase usable floor area compared with selected conventional wall systems — potentially by 8–10% in selected project configurations. The actual gain depends on the building design and comparison baseline.

Lower OPEX across the life cycle

Excellent thermal performance means lower tenant bills and a higher energy class — both key drivers of asset value on EU markets and with lending banks.

A system that scales to a portfolio

One structural system, one quality standard, a repeatable schedule — ideal for serial developers, PRS/BTR funds and investors planning multiple assets in parallel.

03 — Light steel vs traditional masonry

Light steel vs traditional masonry

Six parameters that in practice decide the profitability of an investment.

ParameterTraditional masonryTigaset system
Time to structural completion6–12 monthsPotentially up to 60% shorter*
Quality repeatabilityDepends on the on-site crewHigh repeatability through factory-controlled production
Waste & material lossProject- and processing-dependentSignificantly reduced through prefabrication*
Sellable area from the same plotBaselinePotentially +8–10% in selected configurations*
Structural warrantyStandard 5–10 years30 years
Weather sensitivityHigh (wet processes)Minimal — dry assembly

* Indicative, project-dependent values. Actual results depend on the comparison method, logistics, ground conditions and detailed design assumptions.

Flexible Delivery Models

Choose Tigaset's scope of responsibility.

01

Engineering / Structural Package

Technical coordination and structural solution.

02

Supply Only

Production, documentation and delivery.

03

Supply + Installation

Structural system together with coordinated on-site assembly.

Need installation or labour-only support? Explore Execution →

04 — Proces

Precise structure. Even more precise organization.

Every project starts with a clear read of the investor's goals and the architect's brief. We align prefabrication with the construction schedule so on-site crews arrive in defined windows — no downtime, no hidden costs, no last-minute renegotiation.

  1. 01Project Review
  2. 02Engineering
  3. 03Production
  4. 04Logistics
  5. 05Installation — available for selected projects and markets
  6. 06Handover
Steel structure detail — connection of galvanised profiles

05 — Applications

One system that scales from a single house to full housing estates and public facilities.

The technology supports virtually any project — from single-family homes to large-scale developments. With the appropriate heavy-steel reinforcements, which we also supply, we build up to 7 storeys.

Tigaset project — single-family home in the final construction stage
  • 01Single-family houses
  • 02Multi-family buildings
  • 03Semi-detached
  • 04Terraced housing
  • 05Public buildings
  • 06Mobile offices & temporary structures
  • 07Roof extensions (additional storeys)
  • 08Additions & retrofits

06 — Projects

Selected Tigaset light steel builds — from bare frame to finished façade.

Steel frame of a single-family home — front view
Steel frame of a single-family home — front view
Steel skeleton silhouetted against the sun
Steel skeleton silhouetted against the sun
Attic construction in the light steel system
Attic construction in the light steel system
Load-bearing walls under construction — steel profiles
Load-bearing walls under construction — steel profiles
Commercial building in steel construction
Commercial building in steel construction
Aerial view — two buildings in steel construction
Aerial view — two buildings in steel construction
Roof assembly of a large-scale building with a crane
Roof assembly of a large-scale building with a crane
Detail of steel structure joints — upward view
Detail of steel structure joints — upward view
Barn-style home in light steel construction
Barn-style home in light steel construction
Home façade in the final construction stage
Home façade in the final construction stage

07 — International Project Delivery

Engineering, manufacturing and logistics in one process.

We deliver international projects from documentation adaptation and prefabrication through freight and cooperation with local implementation partners. Tigaset S.A.S. in Montevideo supports our presence in Uruguay, where CIR registration remains in progress.

01

Market-ready documentation

Technical documentation is adapted to each project's requirements and local procedures. In Uruguay, CIR registration remains in progress.

02

Experienced team and manufacturing network

More than 20 years of experience across the people and facilities we work with supports delivery to Eurocodes and EN 1090.

03

Construction-aligned logistics

Prefabrication, freight and deliveries are planned around the project programme to reduce the risk of site downtime.

04

Local implementation partners

We coordinate implementation with contractors and partners in the destination market, maintaining a clear flow of technical information.

A functional home within a sensible budget

STANDARD line

A functional home within a sensible budget

Proven architectural solutions for families who want a comfortable, energy-efficient home without waiting for months on site. Simple form, low running costs, European build quality.

Contemporary architecture with smart-home technology

PREMIUM line

Contemporary architecture with smart-home technology

Modern design with large glazing, top-tier finishes and full project personalisation. Smart-home solutions and the highest energy class as standard.

Tigaset S.A.S. — Colonia 981/305, Montevideo, Uruguay

Certification status

CIR registration in progress

The Tigaset building system is undergoing the Uruguayan Certificado de Incorporación al Registro de un Sistema Constructivo No Tradicional por Declaración Jurada (CIR) procedure. CIR registration is in progress and has not yet been granted. The current documentation status is available on request.

08 — FAQ

Frequently asked questions

What investors and developers ask us in the first conversation. Short, concrete answers.

Is a light-steel house more expensive than masonry?
The price per m² is comparable or lower, and the total investment cost is usually lower — thanks to a shorter build cycle, lower financing costs and reduced material waste. We provide a bespoke calculation for every project.
How durable is the structure?
Properly designed and protected light steel structures can achieve long service lives. Actual durability depends on structural design, corrosion protection, environmental exposure, detailing, maintenance and applicable standards. Galvanized steel provides corrosion protection, while the required fire resistance is achieved through the engineered build-up of the complete assembly.
Can the building be insured on standard terms?
Yes. Structures meet Eurocodes and EN 1090. Insurance terms are confirmed for each specific project and destination market.
Does the investment qualify for a mortgage?
Financing eligibility depends on the individual project, lender requirements, technical documentation, valuation and local banking procedures. We support clients in preparing the required documentation but do not guarantee a financing decision.
What does after-sales service and warranty look like?
A 30-year structural warranty for the load-bearing structure applies, subject to the applicable warranty conditions. We provide project and service support from Poland and, for projects in Uruguay, through Tigaset SAS in Montevideo.
Do you need a special building permit?
No. The procedure is identical to a traditional building. Our design documentation is prepared to satisfy the authorities in Poland, the EU and — through Tigaset SAS — Uruguay and the wider Mercosur region.

09 — Submit Your Project

Submit Your Project

The more context you share, the more precise our first response will be. Every submission is reviewed by our engineering and commercial team.

Tigaset sp. z o.o.

Poland

Tigaset S.A.S.

Montevideo, Uruguay

PDF, DWG, images or archives — up to 20 MB per file.

The initial project screening is free. Detailed engineering, take-off or feasibility analysis may require a separate scope of work.

Your data is used solely to handle this enquiry. Details in our Privacy Policy.